Neighbourhoods

Commuting from South Edmonton: The Henday, Terwillegar Drive, Whitemud and the LRT

By Eddie Gebran Updated 7 min read

An LRT train arriving at an elevated station beside a divided road in Edmonton

Buyers in the south ask about the drive before they ask about the kitchen. This article names the main ways out of the south, says what the City of Edmonton and the Province currently report about the road and LRT work on them, and shows how to test a commute yourself.

It gives no travel times. They change with the hour, the day of the week and the construction season, and a number printed here would be out of date quickly.

The short answer

Most south commutes use the Anthony Henday, Terwillegar Drive, Whitemud Drive, Calgary Trail or 111 Street, with the Capital Line LRT starting at Century Park. Several of these are under construction as of late October 2026. Test your own route at your own hours, and read the City’s current project pages before you offer.

Key Takeaways

  • The City says Stage Two of the Terwillegar Drive Expansion, which includes the Whitemud Drive interchange, was finished in October 2026. Stage Three, at the Anthony Henday interchange, is under construction.
  • The Capital Line South LRT extension is being built, not running. The City’s page anticipates completion in 2029, followed by testing and commissioning, so no opening date exists yet.
  • The Anthony Henday ring road has been complete since October 2016, according to the Province. Noise next to it is a separate question, covered in Eddie’s article on buying near the Henday.
  • Construction can change a route within one season. Check the City’s traffic disruptions page and 511 Alberta before you judge a commute.
  • The only reliable test is your own trip, made at your own hours, on several weekdays.

Which Roads Do South Edmonton Commuters Use?

Five roads come up most often: the Anthony Henday Drive ring road, Terwillegar Drive, Whitemud Drive, Calgary Trail and 111 Street. The Province describes the Henday as the ring road that encircles Edmonton, with its last section opened to traffic in October 2016.

It also reports that the south leg was widened from four to six lanes, with work from 2019 to 2023. The City reports that Terwillegar Drive between the Henday and Whitemud Drive has four lanes in each direction, three for general traffic and one for transit, after Stage One work finished in spring 2024.

111 Street matters for a different reason. It is the street beside which the Capital Line South extension is being built, so its lanes are affected by that project. Eddie did not find a City or Provincial project page for Calgary Trail to cite, so this article says nothing about its current state. Check 511 Alberta for it.

What Is Happening on Terwillegar Drive and Whitemud Drive?

Stage Two is finished and Stage Three is under construction. The City’s October 2026 update says Stage Two widened Terwillegar Drive and Whitemud Drive, renewed and widened the Rainbow Valley Bridge to four lanes each way, improved the Whitemud and Terwillegar interchange and ramps, and added a bus-only lane. Landscaping and site restoration continue into 2027.

Stage Three covers the Anthony Henday interchange. The City’s September 2026 update says it began in early May and is expected to take about two years, and its timeline shows construction finishing in 2028. The plan includes a new northbound bridge over the Henday, two new loop ramps, three lanes in each direction and a pedestrian and cyclist bridge connecting Windermere and Haddow.

The City is direct about the cost to drivers meanwhile: it tells road users to expect congestion and longer commute times, with lane reductions on Terwillegar Drive approaching Windermere Boulevard. It suggests that drivers from Currents of Windermere and Ambleside consider alternate routes, including Rabbit Hill Road.

If you are looking in Windermere, Eddie’s Windermere guide covers the neighbourhood itself. This is the road work to weigh against it.

Where Does the Capital Line South LRT Extension Stand?

It is under construction, with completion anticipated in 2029. The City’s Capital Line South page, last updated 26 October 2026, describes Phase 1 as a 4.5 km high-floor LRT extension from Century Park to just north of Ellerslie Road.

It includes a Twin Brooks station and a Heritage Valley North station that connects to the Heritage Valley Transit Centre and Park & Ride. The contractor began major construction in 2025. The City’s wording is “anticipated completion in 2029, followed by testing and commissioning,” so treat any opening year as an estimate that can move.

The City’s mid-season update lists work done from January to July 2026, including the Blackmud Creek LRT bridge and the Anthony Henday Drive LRT bridge girders. It also says new high-floor light rail vehicles are expected to arrive in 2029 and 2030.

Phase 2 is planned to run from Ellerslie Road to Allard and Desrochers, and the City says concept design has been advanced. Eddie found no construction date for it on the pages he read.

The August 2026 project update also describes lane limits on 111 Street near Blackmud Creek. If an LRT station is part of why you are buying, Eddie’s Heritage Valley guide sets out the neighbourhoods around it, and the zone 55 listings show what is for sale there today.

Which Communities Do the City’s Project Pages Name?

Four communities are named on the pages above, and the table counts their active listings. It is not a list of every community near these routes. Asking prices are shown for detached homes only, because a median across houses and condos mixes two different markets.

Communities named on the City’s project pages: active listings and detached asking prices, as of 20 November 2026
CommunityNamed onActive listingsDetachedDetached median asking
WindermereTerwillegar Drive Stage Three (Windermere Boulevard intersection)8641$865,000
AmblesideTerwillegar Drive Stage Three (traffic advice for drivers)6013$670,000
HaddowTerwillegar Drive Stage Three (new pedestrian and cyclist bridge)73too few to report
Twin BrooksCapital Line South (Twin Brooks station)1410$487,000

To see where the six south zones sit against these routes, open the zone map.

How Do I Test a Commute Before I Buy?

Make the trip yourself, at the hours you would work, several times. A map app’s single estimate cannot show how a Tuesday morning differs from a Friday afternoon. Here is a method that works for any address.

  1. Pick the real trip. Use your actual work address, and add the school or daycare run if you have one.
  2. Drive it on three weekdays at your real departure time, in both directions, and note the slowest day.
  3. Try the alternative route. If a road is under construction, find out how the second-best route compares.
  4. Price the transit option. Plan the trip with Edmonton Transit Service, and check its service alerts page for detours.
  5. Check disruptions. Look at the City’s traffic disruptions map and 511 Alberta for what is closed this week.

Look at what is coming, not only what is closed today. The Capital Line South page has a sign-up for project updates, and the City’s traffic disruptions page offers a weekly construction-season email.

What to Do Next

  1. Write down your real trip and test it on three weekdays before you shortlist an address.
  2. Open the City’s Capital Line South and Terwillegar Drive Stage Three pages, because they change often.
  3. Tell Eddie your route and your must-haves, and he will pull active homes that suit it from the south search. You can also contact him directly.
Eddie Gebran

Eddie Gebran

Eddie is a lifelong Edmontonian and a REALTOR® with RE/MAX Elite. His background includes over 23 years in real estate, five of them in new home sales, and he works mostly with buyers and sellers in the city's south.

Call or text Eddie at 780-906-9959, or write to eddie@eddiegebran.com.

Last reviewed 3 November 2026. This is general information, not legal, tax, mortgage or financial advice. Rules, programs and prices change, so check the current details with the City, the school board, a lawyer or a mortgage professional before you commit. Market figures use asking prices on active MLS® listings, not sales.

Your next step

Start with the Route, Then Find the House

Tell Eddie where you drive or ride to each day and he will shortlist active south homes that suit that trip.

Talk to Eddie

Common Questions

Is the Capital Line LRT open to Heritage Valley?

No. The City’s Capital Line South page, last updated 26 October 2026, describes Phase 1 as under construction, with completion anticipated in 2029 and testing and commissioning afterwards. No opening date has been given. Check that page for the latest.

Is the Terwillegar Drive construction finished?

Partly. The City says Stage Two, including the Whitemud Drive interchange, was completed in October 2026. Stage Three at the Anthony Henday interchange began in early May and the City expects it to take about two years. It warns of congestion in the meantime.

How long is the drive from south Edmonton to downtown?

Eddie does not quote travel times, because they depend on the hour, the day, the route and the construction season. Test your own trip at your own hours on several weekdays, and compare a second route in case the first is under construction.

Where can I check current road closures?

The City of Edmonton publishes a Current Traffic Disruptions page with a map, and the Province runs 511 Alberta for road conditions and cameras. Edmonton Transit Service has a service alerts page for LRT and bus detours. Check all three before you judge a commute.

Does living near the Henday mean noise?

That is a separate question from commuting, and it depends on the exact street. Eddie covers what to check in his article on buying near the Anthony Henday. The Province also publishes noise studies for the ring road on its Edmonton Ring Road page.